Completed • 2025

Kenya Power Transmission Assets Transfer Survey

Kenya Power and Lighting Company

Comprehensive land and asset verification survey for the transfer of transmission line assets from Kenya Power to KETRACO.

Client
Kenya Power
Location
Countrywide
Duration
12 months

Project Overview

Large-scale asset verification project involving comprehensive survey due diligence, boundary assessment, and location confirmation for transmission line assets being transferred from Kenya Power to Kenya Electricity Transmission Company (KETRACO).

Services Provided

Asset location verification Boundary verification surveys Land survey due diligence Asset mapping and documentation Legal transfer support Comprehensive reporting

Technologies Used

GPS/GNSS systems GIS mapping software Survey instruments Digital documentation tools Asset tracking systems

Case study

Problem, approach and outcome — what this assignment demonstrates

The problem

The project required verification of hundreds of transmission line assets across the country, with varying land tenure systems and complex ownership patterns. Accurate boundary verification and asset location confirmation was critical for the legal transfer process.

Context

Large-scale asset verification project involving comprehensive survey due diligence, boundary assessment, and location confirmation for transmission line assets being transferred from Kenya Power to Kenya Electricity Transmission Company (KETRACO).

  • Client: Kenya Power and Lighting Company
  • Location: Countrywide
  • Duration: 12 months

Our approach

Deployed teams nationwide to conduct systematic boundary verification surveys, asset mapping, and land tenure analysis. Used GPS technology and ground truthing to verify asset locations and assess boundary status for each parcel.

Method & technology

Services

Asset location verification Boundary verification surveys Land survey due diligence Asset mapping and documentation Legal transfer support Comprehensive reporting

Technology

GPS/GNSS systems GIS mapping software Survey instruments Digital documentation tools Asset tracking systems

Outcome

Successfully verified and mapped over 800 transmission line assets, completed boundary assessments for associated land parcels, and provided comprehensive documentation supporting the legal asset transfer process.

Capability demonstrated

This assignment sits on the Fayvad pathway:

Need Similar Expertise?

Whether you're planning a similar project or have unique requirements, our team brings the same level of excellence and innovation to every engagement.

Start Your Project